In our March 2015 edition of The Driller, we interview GRL, Pile Dynamics Co-Founder Frank Rausche about being this year's Osterberg lecturer, the state of the industry and what's next.
An ordinary residential job for Ray Bayliff, and most other geothermal drillers for that matter, involves drilling one set of boreholes to install a single geothermal heat pump system for one house.
With all of the push-back we get in our industries, it’s refreshing to know that drilling wells for a geothermal heating and cooling system is more accessible than ever.
The Build-A-Panel PLUS Program is designed to benefit customers who require additional options beyond what the standard control panel line offers, but do not require a custom engineered solution.
Superior Drilling Products has purchased the exclusive manufacturing, marketing and sales rights and the current inventory of the OrBIT completion drill bit product line from Tenax Energy Solutions.