This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
National Driller logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
National Driller logo
  • Home
  • Classifieds
    • Drill Rigs
    • Drill Rig Parts
    • Drilling Industry Jobs
    • Equipment
    • Pump Hoists
    • Services
    • Support Vehicles
    • Tools
  • Markets
    • Environmental Monitoring
    • Foundations
    • Geotechnical
    • Geothermal
    • HDD
    • Mining & Minerals
    • Oil & Gas
    • Water Wells
  • Equipment
  • News
    • Industry News
    • New Products
    • Product of the Week
    • You Know the Drill
  • Opinions
    • Drilling Fluids Tips
    • Editor's Blog
    • Editor's Notes
    • Schmitt's 'Let Me Tell Ya'
    • World According to Wayne
    • Guest Columns
  • Resources
    • Construction Group
    • Custom Content & Marketing Services
    • eNewsletters
    • Events Calendar
    • List Rental
    • Market Research
    • National Driller Store
    • Partners
  • Drill Edu
  • SourceBook
    • Take a Tour
  • Multimedia
    • Drill Channel
    • Ask Brock
    • Webinars
    • Photo Galleries
    • Parting Shot
    • Drillers @Work
    • Drilling History
    • Polls
  • Magazine
    • Current Issue
    • Digital Edition
    • Back Issues
    • Editorial Calendar
    • Subscribe
  • Contact
    • Contact Us
    • Advertise
Home » Tips for Lugging a Bit or Hole Opener
MarketsOpinionsWorld According to WayneWater Wells

Tips for Lugging a Bit or Hole Opener

opening a borehole

Every driller prefers a successful hole to one where they’ve lost a bit or hole opener.

February 7, 2019
Wayne Nash
KEYWORDS drill bits / water well drilling / well drilling
Reprints
No Comments

Social media has changed the way people work and interact in the world. Sometimes it is a great time waster, but often it can be a great source of information. I get emails, texts and calls almost every day from people in the drilling industry who want to pick my brain about something I’ve done before.

The other night, I got into a discussion with a group of well drillers that centered around bits or hole openers backing off in broken, rough-running formations. Nobody likes to admit it, but this happens fairly often in our industry. The reasons — and cures — are pretty straightforward, but often overlooked. It is embarrassing to write on the daily report that you lost the bit, and even harder to tell the boss.

The first thing to consider is torque. The rotary shouldered connections that most of us use are torqued up to have an interference fit between the opposing tool faces. When made up properly, the metal at the face of the tool joint actually yields slightly, making a very strong joint. Most rigs have enough available torque to easily handle the drill pipe and collars. That’s what rigs are designed for. The problem arises when we have to handle a much larger tool joint. This is commonly seen on large bits and hole openers. For larger-sized bits, 6⅝ regular is a common connection. Most water well rigs can’t come close to the high torque numbers that this connection calls for. This is one of the biggest reasons for losing a bit or hole opener — improper make up torque. My friends, it is almost impossible to over torque such a bit connection with the things you have on your rig!

The fix for this has been done in different ways by many drillers for years. I have actually seen drillers weld the bit to the bit sub. This might be fine if the bit is going to last forever. But if you have to remove it, you will find that the bit and the bit sub are ruined. Not a good long-term plan. Most drillers use some sort of lug or strap system that can be cut loose and re-used. The quickest and most common way is to weld a strap vertically across the tool joint. This works in less severe formations, but in high-torque situations — since the bit probably wasn’t made up properly — the strap will shear and free the bit. Not much help there.

Over the years, we have developed a better method to lug a bit or hole opener. This is very important when using a hole opener in a pilot hole. In this case, the bit doesn’t do anything except guide the hole opener and sees very little, if any, torque. In rough running, it is easy to backlash the pipe enough to lose the bit. A proper lug system will fix this without ruining expensive tool joints.

At the top is the bit sub, and at the bottom is the bit or hole opener connection. The bit sub gets a permanently welded lug, about 1-inch-by-2-inches tall, usually made of ⅜-inch steel flat bar. It should be welded on the top, left side, and bottom, leaving the right side square, flush and unwelded. This stays on the bit sub. The lug on the bit is placed close to the top lug and extends from the bit up beside the top lug. It is only welded on the bit, not the sub.

During operation, if rough running is encountered, the joint can make up slightly without any problem. But if the bit tries to back off, the lugs will stop it. I usually leave a small gap between the lugs and measure it before I go into the hole. When I come out, I look and measure again to tell me whether the bit moved. If the gap is larger, it means the bit made up in the hole. If it is smaller, it means the bit was trying to backlash off the pipe and the lug saved it.

This technique is very important when running multiple hole openers. On larger holes, it is common to drill a pilot hole, and then come out, pick up a hole opener and ream. On large holes, it is not uncommon to see two, three or four hole openers stacked up to get to the final hole size. This means that, when reaming, none of the connections below the top one are seeing the drilling torque. That leaves them prone to back off in the hole and means they should be securely lugged. When coming out of the hole, the only lug that needs to be cut is the lower one, leaving the top one undisturbed for future use.

Hope this helps and, although I spent much of my career running fishing tools, the best approach is prevention. If I didn’t explain it well enough, or you need some advice, don’t hesitate to contact me. My advice is free and well worth it.
 


For more Wayne Nash columns, visit www.nationaldriller.com/wayne.

subscribe to National Driller

Recent Articles by Wayne Nash

Tactics for Balling on Tricones, Wing Drilling Bits

Customer Relations Tips for Drilling Contractors

For Drillers, Some Thoughts on Formation Pressure

Pipe Stuck? Common Causes and Solutions for Drillers

For Drilling Jobs, Consider Inflation when Setting Prices

Wayne-nash-200px
Wayne Nash is a regular contributor to National Driller. He can be reached at rockbit8@hotmail.com.

Related Articles

Beyond the Drill Bit: Building a Successful Bottom Hole Assembly

How Do I Drill a Straight Hole for a Well?

Tips for Running, Cementing Casing on Drilling Jobs

Tips for Preparing for Cold Weather Drilling Jobs

Related Events

Building Blocks to Think Like a Driller

Drilling Fundamentals for Hydrogeologists

Related Directories

Star Iron Works Inc.

Groundwater Supply Co. Inc.

Western Hydro

Headwater Wholesale

You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • Print & Digital Edition Subscriptions
  • eNewsletters
  • Online Registration
  • Subscription Customer Service

More Videos

Popular Stories

drilling at a busy gas station

What to Expect When Drilling at an Active Gas Station

Ask Brock video series

How Can a Drilling Company Raise Prices When Competitors Won’t?

log home

How Can Drilling Contractors Spot Employee Theft?

meeting with stakeholders

New Book to Add to Your Drilling Library

drilling job

Four Tips to Recession-Proof Your Drilling Company

 

Show Us Your Rig

Events

December 30, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

View All Submit An Event

Poll

Are We Honest About Close Calls?

How many close calls have you seen on the job?
View Results Poll Archive

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Driller Classifieds

National Driller Magazine

ND December 2019 cover

2019 December

In our December 2019 edition of National Driller, we share insights from Marvin Glotfelty, geologist and author of the book, “The Art of Water Wells”.
View More Create Account
  • Resources
    • Order Reprints
    • Partners
    • Survey And Sample
    • Classifieds
    • Events Calendar
    • Editorial Guidelines
  • Want More?
    • Connect
    • Subscribe
  • Advertise With Us
  • Privacy Policy

Copyright ©2019. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing